一级片黄色一级片-一级片国产-一级片www-一级片a级片-亚洲天堂第一区-亚洲天堂第一

Current Location:Homepage > About Jiahe > news

The new excavator or the overhauled excavator must pass through a period of trial operation, usually called the walking time. The aim of the walking is to prevent the early wear of the excavator and prolong the life of the excavator. The following provisions must be strictly enforced in the period of the excavator's closing period:

(1) in the execution period, the excavator should hang the sign of "walking in period" at the obvious place, so that the relevant personnel can pay attention to the provisions of the period of application, and take it off after the expiration of the term.

(2) running in period 30% engine speed reducer, load 20%-30% operation, no person shall dismantle the engine speed limiting device to be sealed after the expiration of the right under the supervision of technical personnel can be removed.

(3) the throttle is strictly prohibited when the engine is started. The engine should be preheated for 20-50 seconds at low temperature start, and then start immediately. When the engine starts to run for 3-5 minutes at idle speed, the speed and load can be increased when the cooling water temperature rises to 40 degrees.

(4) the technical preparation before engine start, the technical requirements during operation, and the technical work before and after the fire are carried out according to the general mechanical operation rules or the requirements of engine operation instructions.

(5) the excavator should excavate the looser soil in the first 30 or 50 hours of the running period. The loading capacity is 1/2 per time, and the load can increase gradually within 70 or 50 hours later, but it should not exceed 3/4 of the bucket capacity and reduce operation speed appropriately.

(6) during the running period, we should pay attention to the operation of various excavators, check the working temperature of bearings, gears and friction pairs, and observe whether there is leakage in hydraulic system. The abnormal phenomena in the operation should be stopped immediately to check the causes and be excluded.

(7) the working conditions of the excavator should be checked, adjusted and lubricated according to the running condition of the closing period. At the same time, check the cleaning of the gear box lubricating oil and hydraulic oil tank, and replace it when necessary.

TAG:
All rights reserved::Tai'an Jiahe Heavy Machinery Co., Ltd. 魯ICP備07017427號-6 Technical Support: Interplanetary Network
主站蜘蛛池模板: 亚洲国产第一| 91青青在线视频| 久久就是精品| 亚洲国产一区在线| 国产特黄特色a级在线视| 日韩免费高清视频网站| av av在线| 女人体1963免费观看视频| 一个色亚洲| 精品小视频在线观看| 天天干天天夜| 国产精品久久久久久久专区 | 91最新在线视频| 麻豆视频网址| 亚洲天堂2013| 精品72久久久久久久中文字幕| 四虎影院网站| 国产极品美女视频| 日本黄色网页| 99影视在线视频免费观看| 女人l8毛片a级18女人水真多| 一级片免费看| 九九热九九热| 亚洲 欧美 中文 日韩欧美| 国产日韩精品欧美一区| 日韩手机视频| 成人午夜视频在线| 欧美又粗又长| 91亚洲专区| 免费一级做a爰片久久毛片| 一区二区播放| 久操五月天| 亚洲第一视频在线播放| 国产亚洲一区二区手机在线观看| 日日摸夜夜添夜夜添日韩| 大伊香蕉精品视频一区| 欧美在线观看一区二区三| 91五月天| 免费毛片网站在线观看| 亚洲最大福利视频| 九热视频|